Ilmi delivers robust multipurpose drilling rigs to Finland

Ilmi Solutions Oy has sold two robust E.G.T. Srl rigs to Destia Engineering
Oy
. Rigs are by an Italian machine manufacturer E.G.T. Srl. EGT MD series is standing for multipurposerigs, which are designed for drilling and anchoring work, small pile drilling with head hitting techiniques, as well as jet grouting. Both EGT MD815 and MD718 models are equipped at the factory so that they can doall of the above-mentioned drilling works. Ilmi Solutions Oy delivers these particular multi-purpose drilling rigs at the beginning of November 2016.

Destia http://destia.fi

Read More

First Llamada P240TT CFA and DTH machine in Finland located at Tripla worksite

First Llamada P240TT CFA and DTH machine has arrived on Tripla -project at Helsinki Pasila. Machine is drilling D711 dimension piles about 700 pcs which makes 15000 meters. Machine has CFA and Down-The-Hole equiments installed.

Read More

Size and intelligent systems to Destia Down-the-Hole drilling

Destia Engineering Oy Finland carried out a largescale Down-The-Hole hammering job in Helsinki Eastern Pasila new center, Tripla . Destia Engineering Oy has successfully used the Spanish Llamada manufactured Down-The-Hole Hammering machine model P145EV , which is intended to be very demanding blind
bore. The machine delivered by Ilmi Solutions Oy, which also delivers Down-The-Hole hammering documentation system Ilmi iPileCom for DTH. Pile diameters used in Tripla
worksite are up to D1220 mm steel pipes. to support the safe piling created Report Ilmi iPileCom for DTH documentation system to ensure high-quality completion of the piling.

Read More

Swedish piling contractor Hercules seeks benefits from Finnish pile driving documentation system

Swedish Hercules Grundläggning AB, and Finnish Ilmi Solutions Oy from Kuopio, Finland have signed a delivery contract about Ilmi iPileCom pile driving documentation system, Ilmi iPileCom.

– Such system will improve safety on job site. Assistant of the piling rig doesn’t have to be in the close perimeters of the hammer during driving process, says Jan-Erik Svensson from Hercules Grundläggning AB.

Read More

Year 2015 pile driving construction site winner has been documented with Ilmi iPileCom

Yearly elected 2015 pile driving work site winner 2015 has been selected by YIT Rakennus Oy / Infrapalvelut. Selected construction site was East Helsinki’s new shopping center i3. The choice was affected by the construction site arrangements, cooperation with all parties, work organization and well-functioning practices such as automated documentation system, Ilmi iPileCom use.

Ilmi`s automatic pile driving documentation eased considerably the site real-time monitoring and the preparation of the necessary protocols, says senior worksite manager Henri Kiiski.

Read More